|
halfway
through |

lower
view
|

firepit
with formwork |

formwork
detail
|
|

crisco
makes a good bond breaker
|

overlapping
joists on center beam
|

overhang
on west edge
|

cleaning
concrete
|
|

ledger
detail at east edge
|

how
to attach joists at lower level?
|

Lars
welds a steel angle
|
steel angle will hold joists at lower level |
underside of steel angle and bolted sole plates |
top side of sole plates on
level change |
drilling for the joist ledger |
ledger bolted on with expansion
bolts |
blocking under the west side,
under straw wall |
framing around the firepit |
blocking under roof posts |
another angle of the level
change |
almost ready for the plywood
flooring |
almost there... |
completing the flooring |
jon gets a little help from a
nail gun |